Brisbane rope access is the alternative that can eliminate all of the above effectively. Ropes can be removed at the end of the working day thus leaving the building to function normally out of hours without the long term disruption that scaffolding causes. Work areas can be kept small and compact within a specific zone as opposed to 10 floors of scaffolding for work to be carried out generally on less than 2 or 3 of these floors. Noise pollution is considerably decreased and the setup and removal time is almost eliminated resulting in the same quality of artistry without the apparent strains that conventional access methods create.